020 8574 9342 07305 993794 sales@csultd.co.uk
Mon–Fri 8:00–5:00 UK Manufactured Trade Direct
Home About Contact Get a Quote
UK Delivery Available 5yr Sealed Unit Warranty UK Manufactured Trade Prices Direct Instant Online Pricing
Commercial Sealed Units
HomeProductsCommercial Units

Commercial Sealed Units

High-performance units for offices, retail, hotels, schools and hospitals. Solar control from Pilkington Suncool, SGG Cool-Lite, Guardian SunGuard. Up to 6000 × 3210mm. Silicone seal for structural glazing.

Curtain WallStructuralSolar ControlAcousticSpandrel
Overview

Commercial — Facades & Curtain Walling

CSU Ltd manufactures sealed units for all commercial applications. We supply units up to 6000 × 3210mm with solar control coatings for energy efficiency, acoustic laminated glass for noise reduction, fire-rated configurations for compartmentation, and spandrel panels for uniform facade appearance. Silicone secondary seal for all structural glazing where the sealant is UV-exposed.

Commercial Configurations

Commercial glazing facade
Commercial glazing facade
ApplicationConfigurationU-Valg-valLightRw
Office curtain wall6 Suncool 66/33-16-6 Planitherm1.00.3366%34
Retail shopfront6 Clear-16-T6 Low-E Argon1.10.6378%33
Hotel facade6 Suncool 50/25-16-6 Planitherm1.00.2550%34
School window6-16-6.4L Low-E Argon1.10.6378%36
Hospital6-16-8.8L Acoustic Argon1.10.6074%42
Spandrel6 Frit-16-6 Opacified1.133
Retail shopfront glazed with large-format commercial sealed units on a UK high street

Spandrel Panel Options

Spandrel panels hide building structure behind a uniform glass facade. Options include: ceramic frit (enamel fired at 700°C — permanent, colour-matched), back-painted (Lacobel in white, black or grey — other colours digitally printed), and opacified laminate (dark PVB interlayer). All can be colour-matched to vision areas for a seamless appearance.

Vision and spandrel panels glazing into the curtain wall grid:

Commercial glazing project
Commercial glazing project
Commercial Facades
Curtain Wall — Vision & Spandrel Grid
Vision panel Spandrel panel
Vision panels sit at eye level for clear sightlines; spandrel panels hide the structural floor edge behind a uniform glass facade — both can be colour-matched for a seamless elevation.
Commercial glass office frontage
Commercial glass office frontage

Gas Fill — Air as Standard, Argon Optional

CSU sealed units are air-filled as standard. Argon gas fill (minimum 90% concentration) is available as an optional upgrade. Argon has 34% lower thermal conductivity than air (0.018 vs 0.026 W/mK), improving thermal insulation by approximately 15%. Argon is an inert, non-toxic, odourless gas that makes up 0.93% of Earth’s atmosphere — it is inert and environmentally neutral. Krypton gas is available by special order for slim-cavity heritage applications where maximum performance is needed in a narrow gap.

PropertyDry AirArgon (Optional)Krypton (Special)
Thermal Conductivity0.026 W/mK0.018 W/mK0.010 W/mK
U-Value BenefitReference~15% better~25% better
Optimal Cavity12-16mm16-20mm10-12mm
Depletion RateN/A<1% per year<1% per year
Relative Cost~1.2× (included free)~50× (premium)

Spacer Bar Options — Warm Edge vs Aluminium

The spacer bar separates glass panes and creates the sealed cavity. Traditional aluminium spacers conduct heat rapidly (160 W/mK), creating a cold thermal bridge at the unit edge that causes condensation and heat loss. Warm edge spacers use low-conductivity materials, reducing this bridge by up to 94%. CSU recommends Swisspacer Ultimate or Super Spacer TriSeal for all projects.

SpacerMaterialConductivityPsi ValueEdge Temp vs AluColours
AluminiumAluminium alloy160.0 W/mK0.080 W/mKBaseline (cold)Silver, White, Black, Brown, Grey
Swisspacer UltimateComposite polymer0.19 W/mK0.030 W/mK+3-4°C warmerBlack, White, Brown, Grey, Oak +15
Super Spacer TriSealSilicone foam0.17 W/mK0.028 W/mK+3-4°C warmerBlack, Grey
Thermix TX.N PlusStainless + plastic0.60 W/mK0.040 W/mK+2-3°C warmerSilver / Black
TGI SpacerStainless + polymer0.90 W/mK0.050 W/mK+1-2°C warmerSilver

Warm edge improves Uw by 0.1-0.2 W/m²K, eliminates edge condensation, and can improve WER by one full band. Available in widths: 6, 8, 10, 12, 14, 16, 18, 20, 22, 24mm.

On-Site Handling for Commercial Contracts

On phased contracts the storage plan matters as much as the fitting plan. Call off deliveries so each batch is glazed within 28 days, keep units upright on covered A-frames in the meantime, and book mechanical lifting for anything over 60 kg (suction handling covers 25–60 kg). Corner protection stays on until the unit meets its opening, and nothing gets glazed below 5°C.

Typical specStandardExpress
Standard DGU3-5 days1-2 days
Triple Glazed5-7 days3-4 days
Jumbo Units5-10 days

Mixed-spec projects get a consolidated delivery schedule with the quote.

Related Products & Glass Types

Get a Trade Quote

Contact our sales team — most quotes returned within 2 hours.

WhatsApp